Skip to content
Buckeye, Arizona backflow testing requirementsInformational website • No current service operator

Notice Help

Received a Buckeye Backflow Testing Notice?

A testing notice generally means the City has identified a backflow prevention assembly associated with your water service and needs current proof that it is operating correctly.

What to do next

  1. Check the notice for the assembly address, serial number, and due date.
  2. Schedule a certified backflow assembly tester before the deadline.
  3. Give the tester a copy of the notice and any prior test report.
  4. Confirm how the completed report will be submitted to the City.

Why the notice matters

Required assemblies must be tested at least once each calendar year. Missing the stated deadline can lead to follow-up action under the City’s cross-connection control program.

If the assembly fails

Arrange repair or replacement promptly and have the assembly retested. For consumers other than single-family residential customers, City code specifies a 10-day correction period after notification.

Keep the notice. It contains the account-specific details a tester needs and may set a deadline that is earlier than a general annual-testing date.

Review Provider Checklist

Official sources

Regulatory information last reviewed October 5, 2026. Requirements and City procedures can change; confirm account-specific instructions directly with the City.

Know what to verify before hiring a provider.

Check certification, City of Buckeye reporting, permit, and retesting requirements for your property.

Provider Checklist